Kungsmässan parking deck
Volym 0 M3 CO2 BESPARING 0 Ton VIKT PER M2 0 Kg Kontakta oss Volym 0 M3 CO2 BESPARING 0 Ton VIKT PER M2 0 Kg Kontakta oss Kungsmässan parking deck Kungsbacka CHALLANGE & SOULTION In Project P-deck, it was necessary to relocate the parking on the roof of Kungsmässan. In combination with reinforced concrete, […]
Västlänken, Liseberg
In this project, EP’s boards had been drawn as awning insulation under a piled slab. This posed a whole range of challenges, as there were 26 toilet groups and all pipes were hung with over 300 sweeps. In addition, the time pressure was enormous, with only 10 weeks of construction time. Isobetong® was thus the only alternative, which saved 2 weeks of working time and thus “relieved” the pressure in the workplace.
Helipad Queen Silvias Children’s hospital
In Project Helicopter the challenge for the client was pressure resistance despite low weight, as the Helipad was to be located on the top floor of Queen Silvia Children’s Hospital. We could offer the right solution to the problem and NCC chose Isobetong® as a weight compensation.
BT-kemi Teckomatorp
Isobetong® is tasked with insulating the area in Project BT-Chemical, where the ground is heated to evaporate the toxins and thus cleanse the soil of contaminants.