isobetong

Innovation

Isobetong® is synonymous with a sustainable revolution. With Isobetong® opportunities for efficiency and optimization of your project are opened without compromising on quality, economy or the environment. With a unique industrial process developed together with Luca Industries International GmbH, we can offer project-specific solutions everywhere in a construction project. The key is future-oriented clients, process control and a solution-oriented organization. Always #OnDemand. 

Alone on the market to be able to deliver a product under 400 kg/m3 

Completely environmentally friendly without polystyrene or other chemicals 

  • You do not tie up your own staff 
  • Gives you space to focus on other parts of the project 
  • The delivery method removes intermediaries and unnecessary suboperations at the construction site 
  •  

Insulates better than concrete and doesn’t transfer heat 

Suppresses sound effectively 

Mission: BT-Kemi Teckomatorp
Segment: Innovation

Density

0
Kg/Cubic

Volume

0
Cubic

Stages

0

Density

0
kg/cubic

Volume

0
Cubic

Stages

0

Challenge & solution

Isobetong® is tasked with insulating the area in Project BT-Chemical, where the ground is heated to evaporate the toxins and thus cleanse the soil of contaminants. The system is based on the unique thermal in situ method, IT-DSP, where the soil is heated to 300ºC using drilled heating wells. The contaminants are vaporized by the heat and are sucked up through extraction wells to be then handled in an advanced purification plant. You can read more about the method at geoserve.se.

Isobetong’s unique properties seal 100% tightly around the installations. In this way, heat leakage is minimized, the process is made more efficient, and energy consumption is reduced.

The density delivered for the project is 200 kg/m3 because it has an excellent insulating ability combined with high strength. The volume amounted to about 1800 cubic meters and was carried out in two stages.

More cases

Kungsmässan parking deck

Volym 0 M3 CO2 BESPARING 0 Ton VIKT PER M2 0 Kg Kontakta oss Volym 0 M3 CO2 BESPARING 0...

Västlänken Liseberg

Västlänken, Liseberg

In this project, EP’s boards had been drawn as awning insulation under a piled slab. This posed a whole range...
Helikopterplattan Drottning Silvias Barnsjukhus

Helipad Queen Silvias Children’s hospital

In Project Helicopter the challenge for the client was pressure resistance despite low weight, as the Helipad was to be...