Earned working time

Days
0

Density

KG / Cubic
0

Cold draught

%
0

Earned working time

Time
0

Density

Kg/Cubic
0

Cold draught

%
0

Västlänken, Liseberg

CHALLANGE AND SOLUTION
In this project, EP’s boards had been drawn as awning insulation under a piled slab. This posed a whole range of challenges, as there were 26 toilet groups and all pipes were hung with over 300 sweeps. In addition, the time pressure was enormous, with only 10 weeks of construction time. Isobetong® was thus the only alternative, which saved 2 weeks of working time and thus “relieved” the pressure in the workplace.

CLIENTS & REFERENCE PROJECTS
Since our start in 2016, we have carried out a significant number of projects within the segments of FLOOR, ROOF, INFRA, and INNOVATION. Today, we collaborate with several clients such as Skanska, Peab, NCC, and GeoTech.

#8 Göran Nilsson

Försäljningsansvarig, ISO-Ingenjör
goran@isobetong.se
0731429248

#66 Janne Klingler

Produktionsledare
janne@isobetong.se
0709998998