isobetong

REDUCED TRANSPORTS

0

Saved kilometers

0
Km

Volume

0
M3

Reduced transports

0

Saved kilometers

0
Km

Volume

0
M3

Geely Innovation Center Lindholmen

CHALLANGE & SOLUTION

In the Geely Innovation Center project, a new smaller district was built, including a large hotel in one part of the area. The challenge for our client, BRA Group, was to minimize the load on the quay edge, necessitating some ground measures. Our solution involved excavating heavy and contaminated clay and then filling it with Isobetong®. The result of using Isobetong® instead of other alternatives allowed the project to save nearly 6000 m3 of excavation and landfill. Production occurred at a rate of 300 m3/day and lasted for approximately 2 months.

CLIENTS & REFERENCE ASSIGNMENTS
Since our establishment in 2016, we have completed a significant number of projects in the FLOOR, ROOF, INFRA, and INNOVATION segments. We currently collaborate with several clients such as Skanska, Peab, NCC, and GeoTech.

#8 Göran Nilsson

Försäljningsansvarig, ISO-Ingenjör
goran@isobetong.se
0731429248

#66 Janne Klingler

Produktionsledare
janne@isobetong.se
0709998998